|
5S: Facilitator Guide
(1) Comprehensive, easy to use facilitator
guide for training employees on the 5S and steps
for implementation.
5S: Preparation Guide (1) The guide
contains a systematic approach to preparing and
executing successful workshops in 5S and is included
with the purchase of a solution package. It helps
the first time trainer prepare for the event, and
it is a reference manual for timing, scheduling,
and the overall process of the workshop.
5S: Facilitator Digital Media CD (1)
Designed using Flash technology, the 5S presentation
is a cut above anything that could be designed
in PowerPoint. Latest technology in presentation
format using dynamic formatting and projection
of image and content.
5S: Participant Workbook (8) Designed
with the participants in mind, this workbook will
be used during the workshop and retained for reference.
These workbooks combine information, illustrations,
key questions, and space for note taking. Includes
a self assessment form to test understanding of
principles communicated during the workshop.
5S: Red Tag Register (1) An 11x14
pad of forms that logs all items identified by
red tagging.
|
5S: 30 Day Action Log (1)
An 11x14 pad of forms for the entry of
action items to be implemented in the 5S area
within the next 30 days.
5S: Map (1) An 11x14 pad of forms
for recording a bird's-eye view of the area for
referencing layout and 5S related opportunities.
5S: Sustainment Schedule (1) An
11x14 pad of forms for the scheduling ongoing
activities to maintain 5S in an area until a permanent
solution can be found.
5S: Evaluation Review Form (1) An
11x14 pad of forms, for participants, managers,
supervisor, or whoever is responsible for benchmarking
and auditing 5S in an area on a periodic basis.
5S: Red Tags (100) These oversized
5S tags are designed with usefulness in mind.
Large enough to record information but small enough
to be useful, Enna's 5S Red Tags allow for the
control and structure of the sort step of 5S.
Each Red Tag has been pre-threaded for ease of
use.
5S: Poster (2) A full color visual
aid to be used during training and posted in work
areas as a reference to the 5S principles.
7 Wastes of Operations: Poster (2) A full
color visual aid to be used during training the
5S and posted in work areas to remind staff to continuously
eliminate waste.
|